The driveway approach off the road had washed and rutted to the point where any rain dumped water back toward the house. I cleared the edges, regraded the apron with a skid steer crew, and brought a paving crew in to finish the asphalt. Cleaner line off the road, water sheds the right way, and the cars stop dragging on the lip.
-
During Raked back the overgrown vinca off the gravel edge before regrading.
Want a Plan for Your Project?
Send photos and a few sentences. I'll send back a written diagnostic — what's broken, what it'll cost, and what to DIY vs. hire. $9.99, in your inbox in minutes.
Get a Diagnostic Report — $9.99 → Save this project for later: Save to Pinterest