The old septic at the lakeside place was undersized and failing. I had the excavator on site through a cold stretch and we set the new tank in winter so it'd be ready before spring. Ran new lines, set risers up to grade so service is easy, and tied a stone retaining wall into the disturbed ground so the lawn wouldn't slide back into the trenches. Seeded and strawed before the rains came.

  1. Fresh tank lids next to the cabin. Tied them in alongside the boulder retaining wall I was building. During

    Fresh tank lids next to the cabin. Tied them in alongside the boulder retaining wall I was building.

    plumbing
  2. Green risers set to grade so the pumper doesn't have to dig every time it gets serviced. During

    Green risers set to grade so the pumper doesn't have to dig every time it gets serviced.

    plumbing
  3. Backfilled and rough-graded around the cabin. Next pass was finish dirt and seed. During

    Backfilled and rough-graded around the cabin. Next pass was finish dirt and seed.

    plumbing
  4. Lids and trench lines visible across the lawn. Easier to hit them now than dig blind later. After

    Lids and trench lines visible across the lawn. Easier to hit them now than dig blind later.

    plumbing
  5. Boulder retaining wall going in beside the new septic to hold the regraded slope. During

    Boulder retaining wall going in beside the new septic to hold the regraded slope.

    plumbing
  6. Septic access lids exposed for inspection before final cover and seed. During

    Septic access lids exposed for inspection before final cover and seed.

    plumbing
  7. Seeded and strawed over the disturbed ground so we'd have grass before summer. After

    Seeded and strawed over the disturbed ground so we'd have grass before summer.

    plumbing
  8. Surveyor's tripod on the snow while the excavator started the cut for the new tank. During

    Surveyor's tripod on the snow while the excavator started the cut for the new tank.

    Dec 20, 2022 plumbing
  9. Excavator and skid steer working the front yard in the snow — winter install was the only window I had. During

    Excavator and skid steer working the front yard in the snow — winter install was the only window I had.

    Dec 21, 2022 plumbing
  10. Lowering the new tank into the hole. Cold work but the ground wasn't frozen deep enough to be a problem. During

    Lowering the new tank into the hole. Cold work but the ground wasn't frozen deep enough to be a problem.

    Dec 22, 2022 plumbing
  11. Pump truck and skid steer below while I regraded the hillside above the new system. During

    Pump truck and skid steer below while I regraded the hillside above the new system.

    Dec 27, 2022 plumbing
Save this project for later: Save to Pinterest