I bought this place with painted-over floral wallpaper, pine paneling over plaster, and rodent nests in the wall cavities. To do the electrical and insulation right I needed it all gone, so I took the walls and ceilings down to the studs across the main floor and bedrooms. Most of the demo I did myself — wallpaper steamer, pry bar, shop vac, respirator, repeat. Hauled it all out in contractor bags.
-
Before Original main bath: floral wallpaper, vinyl tile, vanity rotting at the base.
-
During Hauling out the old cabin in trash bags. Tools out, drill staged, ready for the next room.
-
Before Empty back bedroom before I touched it. Carpet, pine paneling, all coming out.
-
Before Goose coat rack and striped wainscoting wallpaper. This is what I bought.
-
Before Peel-and-stick floor tiles cracked and lifting where someone had patched over the hardwood.
-
During Whole doorway packed with debris, rolled carpet, lumber scraps. One day's haul-out.
-
During Opened a wall and found a rodent nest behind the wallpaper. That's why everything had to come out.
-
During Pulled the drywall around the AC sleeve and exposed the old foil-faced Kimsul insulation.
-
During Mid-demo lakeside room. Insulation showing, paneling stacked, slider next on the list.
-
During Stripped down past the Kimsul. Paneling stacked on the floor for haul-out.
-
During Demo bags stacked next to the old roof vent box. Took weeks to clear all of it.
-
During Shop vac in the living room before I tore up the blue carpet. Containing the dust as best I could.
-
Suited up in the respirator and goggles. Going into rooms where I knew the dust was bad.
-
Before My son standing in the lakeside room before we tore into it.
-
Before Home Depot rental truck loaded with insulation and lumber. One of many trips.
-
During Upstairs hallway carpet pulled, demo bags lined up, subfloor adhesive still to scrape.
-
Before Lumber and materials staged under the deck for the next round.
-
Before Bedroom before. Striped wallpaper, ceiling wires hanging, drill on the floor where I left it.
-
Before More goose hooks and wainscoting in the basement room. All of it came down.
-
During Floral wallpaper coming off the plaster. Steamer and a scraper, hours per wall.
-
During Stripped to studs with the old Kimsul still in. Insulation came out next.
-
During Mid-demo bedroom — ceiling stripped to the joists, wallpaper coming down.
-
Before Living room before any of this started. Blue carpet and the original sliders to the deck.
-
During Bathroom down to the studs. You can see the old plumbing rough-in.
-
Before Another bedroom before. Drop ceiling, striped wallpaper, green carpet.
-
During Opened the wall between the window and door to fish new wiring through.
-
During Pulled the subfloor and looked straight down at the joists and the room below.
-
During Ceiling drywall pulled, joists and old insulation exposed, wires hanging out.
-
During Bedroom mid-demo. Ceiling out, wallpaper still up, shop vac running.
-
During Opened the ceiling cavity and found old foil-faced ductwork and blown-in insulation.
-
During All the old wiring and devices I pulled out. Cabin was getting a new electrical system.