New Need a website, or want to automate your business? IT Services by Hammond RE-Engineered
← Paulinskill Lake House

New Septic at Paulinskill — Lids and Risers

6 photos · plumbing

Tank lids next to the cabin, green risers set to grade so the pumper doesn't have to dig every time it gets serviced. Tied in alongside the boulder retaining wall.

  1. Fresh tank lids next to the cabin. Tied them in alongside the boulder retaining wall I was building. During

    Fresh tank lids next to the cabin. Tied them in alongside the boulder retaining wall I was building.

    plumbing
  2. Green risers set to grade so the pumper doesn't have to dig every time it gets serviced. During

    Green risers set to grade so the pumper doesn't have to dig every time it gets serviced.

    plumbing
  3. Backfilled and rough-graded around the cabin. Next pass was finish dirt and seed. During

    Backfilled and rough-graded around the cabin. Next pass was finish dirt and seed.

    plumbing
  4. Lids and trench lines visible across the lawn. Easier to hit them now than dig blind later. After

    Lids and trench lines visible across the lawn. Easier to hit them now than dig blind later.

    plumbing
  5. Boulder retaining wall going in beside the new septic to hold the regraded slope. During

    Boulder retaining wall going in beside the new septic to hold the regraded slope.

    plumbing
  6. Septic access lids exposed for inspection before final cover and seed. During

    Septic access lids exposed for inspection before final cover and seed.

    plumbing
Save this project for later: Save to Pinterest