New Septic at Paulinskill — Lids and Risers
6 photos · plumbing
Tank lids next to the cabin, green risers set to grade so the pumper doesn't have to dig every time it gets serviced. Tied in alongside the boulder retaining wall.
-
During Fresh tank lids next to the cabin. Tied them in alongside the boulder retaining wall I was building.
-
During Green risers set to grade so the pumper doesn't have to dig every time it gets serviced.
-
During Backfilled and rough-graded around the cabin. Next pass was finish dirt and seed.
-
After Lids and trench lines visible across the lawn. Easier to hit them now than dig blind later.
-
During Boulder retaining wall going in beside the new septic to hold the regraded slope.
-
During Septic access lids exposed for inspection before final cover and seed.
Want a Plan for Your Project?
Send photos and a few sentences. I'll send back a written diagnostic — what's broken, what it'll cost, and what to DIY vs. hire. $9.99, in your inbox in minutes.
Get a Diagnostic Report — $9.99 →