Rebuilding the Bathrooms

23 photos · bathroom

Three bathrooms got rebuilt — the original upstairs bath, a small main-floor powder room, and the basement bath under the stairs. Tore each one down to studs and slab, replaced supply and drain lines while the walls were open, ran new venting, and put in moisture-resistant drywall and cement board. Tile floors, subway-tile shower walls, new vanities, and chrome fixtures throughout. Pedestal sink and a blue chandelier in the powder room — small space, worth a moment.

  1. Original upstairs bath before — subway tile surround, mosaic floor, and a radiator under the window. Before

    Original upstairs bath before — subway tile surround, mosaic floor, and a radiator under the window.

    bathroom
  2. Powder room with vanity and toilet pulled. Capped the lines and prepped the floor for new tile. During

    Powder room with vanity and toilet pulled. Capped the lines and prepped the floor for new tile.

    bathroom
  3. Old fiberglass surround coming out in pieces. Drywall behind it was soft from years of leaks. During

    Old fiberglass surround coming out in pieces. Drywall behind it was soft from years of leaks.

    bathroom
  4. Pulling the old shower drain assembly out of the pan with a pry bar and rubber mallet. During

    Pulling the old shower drain assembly out of the pan with a pry bar and rubber mallet.

    bathroom
  5. Bathroom down to studs with the plumbing stack and old subfloor exposed. During

    Bathroom down to studs with the plumbing stack and old subfloor exposed.

    bathroom
  6. Bath gutted to the studs. Copper supply lines still good — re-soldered the joints I cut. During

    Bath gutted to the studs. Copper supply lines still good — re-soldered the joints I cut.

    bathroom
  7. Slab bath stripped to capped supplies and drain. Easier to start fresh than patch around the old work. During

    Slab bath stripped to capped supplies and drain. Easier to start fresh than patch around the old work.

    bathroom
  8. Studs, plumbing stack, and the old radiator left in place. Repainted the radiator before the new tile went down. During

    Studs, plumbing stack, and the old radiator left in place. Repainted the radiator before the new tile went down.

    bathroom
  9. Slab broken open to get at the drain. The original cast iron was cracked at the trap. During

    Slab broken open to get at the drain. The original cast iron was cracked at the trap.

    bathroom
  10. New tub set, supply lines run, walls open for a final inspection look. During

    New tub set, supply lines run, walls open for a final inspection look.

    bathroom
  11. Plumbing stack exposed through the framing — easier to tie in the new fixtures with a clear run. During

    Plumbing stack exposed through the framing — easier to tie in the new fixtures with a clear run.

    bathroom
  12. New shower valve and exhaust vent roughed in. Cement board and tile coming next. During

    New shower valve and exhaust vent roughed in. Cement board and tile coming next.

    bathroom
  13. Purple drywall hung and the new shower pan dropped in with the drain set. During

    Purple drywall hung and the new shower pan dropped in with the drain set.

    bathroom
  14. Cement board around the tub and moisture-resistant drywall on the rest of the walls. During

    Cement board around the tub and moisture-resistant drywall on the rest of the walls.

    bathroom
  15. Walk-in shower mid-tile with marble-look floor and white subway up the walls. During

    Walk-in shower mid-tile with marble-look floor and white subway up the walls.

    bathroom
  16. Drywall up, plumbing stub set, underlayment down. Ready for the tile installer. During

    Drywall up, plumbing stub set, underlayment down. Ready for the tile installer.

    bathroom
  17. Bathroom masked off with tape and plastic before I rolled the wall paint above the new tile. During

    Bathroom masked off with tape and plastic before I rolled the wall paint above the new tile.

    bathroom
  18. Same bath fully sheeted off so paint wouldn't land on the new fixtures. During

    Same bath fully sheeted off so paint wouldn't land on the new fixtures.

    bathroom
  19. Walk-in shower done — white subway, dark grout, and chrome trim. After

    Walk-in shower done — white subway, dark grout, and chrome trim.

    bathroom
  20. Small bath done with marble-look floor, compact vanity, and a new low-flow toilet. After

    Small bath done with marble-look floor, compact vanity, and a new low-flow toilet.

    bathroom
  21. Family bath finished — same floor tile, fresh paint, chevron curtain on the new tub. After

    Family bath finished — same floor tile, fresh paint, chevron curtain on the new tub.

    bathroom
  22. Powder room done with a pedestal sink and a blue chandelier as the moment. After

    Powder room done with a pedestal sink and a blue chandelier as the moment.

    bathroom
  23. Other side of the powder room — built-in cubby shelves under the chandelier. After

    Other side of the powder room — built-in cubby shelves under the chandelier.

    bathroom