Drywall and Finish on the Main Floor

2 photos · drywall

Once rough electrical, plumbing, and insulation were signed off, I hung drywall, taped, mudded, and sanded the whole main floor. Three coats on every seam, sanded between, then primed and rolled. Matched the new ceilings to the existing arched openings I kept from the original layout. Joint compound buckets lined the room for a couple weeks straight.

  1. First coat of mud on the new ceiling. Three coats and a sanding to go. During

    First coat of mud on the new ceiling. Three coats and a sanding to go.

    drywall
  2. Drywall taped, joint compound buckets staged. The slow part of any gut. During

    Drywall taped, joint compound buckets staged. The slow part of any gut.

    drywall