← Mohawk Lake Cottage

Boiler, Baseboard Heat, and Water Heaters

5 photos · hvac

The Buderus oil boiler stayed but the loops and trim around it didn't. I cleaned up the copper manifold with new zone valves, rebuilt the expansion tank tie-in, and ran fresh PEX along the baseboards in the rooms I'd opened up. Two new electric water heaters on a copper manifold below the joists with PEX feeds out. New baseboard covers everywhere.

  1. Buderus boiler with the rebuilt copper manifold, zone valves, expansion tank, and circulator. After

    Buderus boiler with the rebuilt copper manifold, zone valves, expansion tank, and circulator.

    hvac
  2. Two electric water heaters on a copper manifold below the joists. Redundant and serviceable. After

    Two electric water heaters on a copper manifold below the joists. Redundant and serviceable.

    hvac
  3. PEX run along the baseboard, clamped tight under the original wood paneling. During

    PEX run along the baseboard, clamped tight under the original wood paneling.

    hvac
  4. Closet alcove stripped to studs with PEX run on the floor for the new vanity hookup. During

    Closet alcove stripped to studs with PEX run on the floor for the new vanity hookup.

    hvac
  5. New white baseboard heater cover against the dark paneling, vinyl plank running underneath. After

    New white baseboard heater cover against the dark paneling, vinyl plank running underneath.

    hvac
Save this project for later: Save to Pinterest