Old panel was full and undersized. I added breakers, set a Generac whole-panel surge protector, and ran new conduit and outlets in the basement. Used the open framing to set up a proper laundry corner with a new Amana washer and dryer. Final electrical inspection signed off in January.
-
During Panel open with the new Generac surge protector wired in alongside the breakers.
-
During New conduit and outlet rough-in in the basement. Easier to plan once the joists were exposed.
-
During New duplex outlet on a floor joist with the blue old-work box and Romex run cleanly along the framing.
-
After Same outlet finished off, button-down clean.
-
During New Amana washer and dryer set, mid-hookup. First load was a stack of dusty work towels.
-
After Final electrical inspection signed off January 4, 2023.
-
After Inspection sticker on the panel. That sticker means I can close walls.
Want a Plan for Your Project?
Send photos and a few sentences. I'll send back a written diagnostic — what's broken, what it'll cost, and what to DIY vs. hire. $9.99, in your inbox in minutes.
Get a Diagnostic Report — $9.99 →